How to verify Compute Block is powered ON or manually Power Cycle

Creation date: 3/15/2017 12:50 PM    Updated: 3/15/2017 12:50 PM
Compute Blocks are designed to automatically power back on if a temporary power loss occurs.

However if an extended local power loss occurs or UPS fails then it may be necessary to manually power the Compute Block ON.

This is done by depressing the power button on the front of the unit/s and then verifying that the activity light is green.
Files
Workstation Server Router Wifi Switch Firewall Peripheral Support